Feedback-controlled air-supply system



Currently I am also working as project manager of a feedback controlled air supply system that will greatly enhance the experimental capabilities at GDTL.

The facilities of GDTL operate with air stored in two high-capacity tanks at pressure between 1000 and 2300 psig. This high pressure, required for other experimental needs, is excessive for the GDTL uses and must be reduced and maintained to values between 1 to 250 psig regardless of pressure fluctuations in the tanks. To this aim two control valves are used, the one for higher mass-flow experiments, the other for lower mass-flow experiments. Originally these valves were controlled by hand which required constant adjustments during the experiments. In 2004 I upgraded the system to include a feedback control unit operating the valves so to maintain automatically the stagnation pressure of the experiments to the desired value. Figure 1 shows a schematic of this air-supply system. V2H and V2L are respectively the high and the low-mass flow control valves and other isolation/distribution valves are also indicated. This system allowed GDTL to operate a cold jet facility J and the cavity-flow facility C.

 old system  new system
Figure 1: Schematic of old controlled air-supply system
at GDTL.
Figure 2: Schematic of new controlled air-supply system
at GDTL.


The project I am currently managing in conjunction with Aero Systems Engineering dramatically increases the GDTL experimental capabilities. A schematic of the new controlled air-supply system is shown in Fig. 2 above. The jet facility J can now use both cold and hot (up to 1100 F) air and can be surrounded by a large secondary stream to simulate the effect of forward flight up to Mach 0.3. Figure 3 shows the roll-in, the raise, and the final setup of the regenerative storage heater and the jet facility.

 heater roll-in  heater rise  heater and jet facility
Figure 3: Regenerative storage heater roll-in (left), raise (center), and final setup with the jet facility (right).


With the new air-supply system the cavity-flow facility C can operate in the full subsonic range. Finally a new, dual-stream shear layer facility S has been put on line, Figs. 2 and 4. This facility has a modular construction that allows it to be modified into a single stream, supersonic cavity-flow facility.

 SLF construction              SLF completed
Figure 4: Shear layer facility during construction (left), and completed (right).

Besides granting a whole new series of experimental capabilities, the new controlled air-supply system is very simple to use. In its design I included a safety logic scheme that does not permit operation if the system is improperly set and I put great emphasis in simple and effective ergonomics. This new system is currently undergong initial tests. Once these will be completed, it will allow me and my colleagues at GDTL to run a wider spectrum of experiments with an unprecedented level of convenience and comfort.